There is no statewide permit fee in Massachusetts. The Massachusetts State Building Code (780 CMR) sets the process every municipality follows, but each city and town writes its own fee schedule — and they do not all charge on the same basis. Two identical projects in neighboring towns can be priced in completely different ways.

That is why there is no meaningful "average Massachusetts permit fee". What you can know in advance is how your municipality calculates, which is what this page covers. For the review deadlines — which are identical statewide — see our guide to Massachusetts permit timelines under 780 CMR.

The five bases municipalities use

Most towns combine several of these, applying different bases to different permit types. A single project can therefore be billed on two or three at once.

How Massachusetts municipalities calculate construction permit fees, with published examples from Omega Permits' municipal fee guides.
Basis How it works Published example
Per $1,000 of value A rate applied to the declared cost of the work. The most common basis for building permits, and the reason an accurate cost estimate matters. Brookline charges $20 per $1,000 of construction value across building, electrical, plumbing, gas, mechanical, sprinkler and demolition permits.
Flat fee plus a rate A fixed charge to open the permit, plus a value-based rate on top. A Boston amendment is $20, plus $10 per $1,000 of the estimated cost of work.
Per square foot A rate applied to floor area rather than cost, almost always with a minimum. Agawam charges $0.30 per sq ft for additions, minimum $100; accessory buildings are the same rate with a $50 minimum.
Per fixture or device A flat charge per item installed. Standard for plumbing, gas and electrical work, so the count of fixtures drives the fee, not the project's value. Used alongside value-based rates in Auburn and Beverly.
Flat fee A single fixed charge, typical for certificates and administrative items. Agawam charges $45 for a Certificate for Use. A Boston change of occupancy is $20 for three families and under, $50 for four and up.

What pushes the total up

  • Each trade is its own permit. Building, electrical, plumbing, gas and mechanical work are permitted and charged separately, so a single renovation commonly carries four or five fees rather than one.
  • Minimums apply on small jobs. Where the calculated fee falls below the town's floor, you pay the floor — Brookline's minimum permit fee is $50.
  • Starting without a permit costs more than the permit. Brookline adds a penalty of $50 per $1,000 of construction value on work begun without the required permits — two and a half times its normal rate.
  • Re-inspections and missed deadlines carry charges. Brookline charges $50 for each re-inspection, and $50 for failing to call for a final inspection within 10 working days.

Fee schedules change. Every figure above is drawn from the municipal guide linked below, which cites the schedule it came from — always confirm against your building department before budgeting.